We started decking out the floor but managed to have all sorts of problems with that, especially as I hadn't remembered the Soil Pipe was sticking out of the wall which made getting the first complicated piece difficult to fit. Then my electric screwdriver decided that it didn't like screwing in around 200 screws into the floor, so I had to revert to my pump driver. So things didn't go quite as planned but the new light is installed, the floor is in and primed ready for tiling tomorrow. The walls are drying out nicely and I'll give the floor tiles a go tomorrow. Luckily they are quite large so I don't suppose it will take a long time but drying out may take a while.
I'm a day behind which is annoying but can't be helped I suppose. I really could do with sorting this out this week so that at least we can have a bath even if I can't sort out the shower by the end of the week.
My new memoflex glasses have arrived which replaced my nice pair of reading glasses I broke when letting the plasterer in last week! These look to be pretty good as they are flexible and shouldn't break easily (famous last words).
Need to watch out tonight for cramps - got two nasty seizures last night along with a series of small twinges and also this evening got a few too.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment